Murdoch University Laboratory Upgrade

Project Details

Category
,
Client
Murdoch University

Murdoch University have been upgrading their labs, and contracted Total Project Solutions to upgrade the Physical and Biological Laboratories.

The project was to upgrade 6 laboratories simultaneously with the least amount of disruption to students.  The labs needed to be stripped out of the existing fittings.  New chemical resistant benchtops along with the latest in tap fittings had to be installed.

There was vinyl applied to the floors and walls, as well as custom built cabinets.  The project had to be completed within a very tight timeframe and remain on budget.  Total Project Solutions achieved both with the project.

Back to All Projects

Gallery